Posted by rogerdurbin on
October 31, 2008
10-31-08 Sprung Construction at The Bridge
Today was insulation day… And with the great 75 degree weather, the lady bugs were everywhere! Check the pics!
Posted by rogerdurbin on
October 30, 2008
Bridge Sprung Construction Day 13, 10-30-08
Beautiful day today! We finished skinning the lower end, insulated the remaining 2 full panels, and installed 2 more door frames.
Click pics 3 times for full size.
Posted by rogerdurbin on
October 29, 2008
Bridge Sprung Construction Day 12 10-29-08
Pics from day 12…
Posted by rogerdurbin on
October 28, 2008
10-28-08 Bridge Sprung Construction Day 11
Beautiful day today, we got an amazing amount of work done! All the trusses are up and roped, front door opening is up, yesterday we got the insulation and inner skin on the front end. Tomorrow we will skin the lower end and pop out the front end… Sweet!
(click on pics 3 times for full size)
Posted by rogerdurbin on
October 26, 2008
10-26-08 Worship Set
10-26-08 Worship Set
Sermon – Tim Gray
I Am Church, We Are Church - Marriage
Ben Durbin – Guitar/Vocals
Matt Pratt – Guitar/Vocals
Seth Durbin -Drums
Tisa Ayers – Vocals
Roger Durbin – Bass/Vocals
Tammy Durbin – Keys/Vocals
- The Welcome Song - Pocket Full Of Rocks
- Everything Glorious - Crowder
- We Will Dance – Steven Curtis Chapman
- Here Am I (All Of Me) - Tomlin
- Here Is Our King - Crowder
Posted by rogerdurbin on
October 25, 2008
Bridge Sprung Construction – 10-25-08
Skin, insulation, and the inside of the backstage service door today.
(click on pics 3 times for full size)
Posted by rogerdurbin on
October 24, 2008
Sprung Construction – 10-24-08
Yesterday, rain kept us from doing much, we just fastened the building edges down and welded the expansion holes and one of the inside beams. Today we set the front end beams, skinned part of it, and set the back service door. We couldn’t set the other end trusses because of the mud from yesterday’s rain. The crane will come back to set the rest of the trusses Tuesday. In about a week to 10 days, the outside will look mostly finished!
(click pics 3 times for full size)
Posted by rogerdurbin on
October 22, 2008
Sprung Construction Day Seven 10-22-08
Today we skined 3 more inside sections, Stretched the 3 sections, permanently bolted the trusses, and started fastening down the outside edge to the concrete. Tomorrow will be a fun day if the weather allows, we will stand the other 120′ of trusses with a crane.
(click 3 times for full size)
Posted by rogerdurbin on
October 21, 2008
Day Six Sprung Construction 10-21-08
Today we skinned the inside of 3 sections (45′) and then stretched each section 6 inches. As you can see in the pics the skin is tight on the first 3 sections now. We also put in the frame for the backstage doors and assembled the rest of the trusses.
Posted by rogerdurbin on
October 20, 2008
Day Five – 08-20-08 Sprung Construction
With 20 or so church people working, today we finished the insulation on the part that’s standing, and assembled most of the remaining trusses. We have 90′ standing, the other 120′ will be up before the week is done. Each section you see in the pics is 15′ across. Tomorrow we will put up the inside liner on the standing 90′, and it will be blown out 6″ per truss to make outside skin tight.
(Click 3 times for full size)